Your floor plan, rescheduled every fifteen minutes.
AI that sees what your whiteboard can't — machine uptime, operator availability, and order deadlines, unified.
Before the pitch
See your numbers first.
Enter your floor parameters. The calculator runs the math before you read another word.
OEE Savings Estimator
What are idle spindles costing you?
Enter your floor parameters
to see your recovery estimate
Capabilities
Every constraint your whiteboard ignores.
Eight discrete systems, running in parallel, rebuilding the floor plan while your shift supervisor is still drinking their coffee.
Real-Time Rescheduling
Rebuilds the entire floor plan every 15 minutes against live machine uptime, operator check-ins, and order deadlines.
Constraint Balancing
Weighs tooling availability, coolant changeovers, fixture queues, and skill certifications simultaneously — not one at a time.
Shift Handoff Reports
Auto-generates a one-page handoff brief at shift change: what ran, what slipped, what the next crew needs to watch.
ERP Sync
Reads work orders from SAP, Oracle, or your shop-floor MES and writes actuals back without manual re-entry.
Downtime Response
When a spindle goes down, jobs are rerouted in under 90 seconds — before the operator has finished filing the ticket.
OEE Live Dashboard
Every supervisor sees the same real-time utilization heatmap on any screen — tablet, desktop, or shop-floor kiosk.
Operator Availability
Tracks clock-ins, certifications, and cross-training flags so the schedule never assigns a job to a machine with no one qualified to run it.
On-Time Delivery Guard
Computes backward from every ship date and flags at-risk orders 48 hours before they become a customer call.
Under the hood
What happens every 15 minutes
Ingest
Reads machine OPC-UA telemetry, ERP work orders, operator clock-in data, and tooling inventory.
Model
Builds a constraint graph: every machine, every job, every operator, every deadline, every dependency.
Solve
Runs a mixed-integer optimization pass in under 40 seconds across all active constraints simultaneously.
Deploy
Pushes the new schedule to every screen on the floor and writes actuals back to your ERP.
Field Results
Before and after. Real plants.
Anonymized data from production pilots. Same floor, same crew, same orders — different schedule.
Aerospace Subcontractor · 14 CNC Lines
"We stopped using the whiteboard on day three. The AI just knew what to do."
Plant ManagerPrecision Machining · 8 Turning Centers
"Found the last 8% of OEE we had been chasing for two years."
Continuous Improvement EngineerContract Manufacturer · 3-Shift Operation
"Third shift finally runs as clean as first. Same schedule, same discipline."
Operations DirectorThe last eight percent of OEE
is waiting on the schedule.
Install on a tablet at the floor manager's station. Live in under two hours. No IT project, no consulting engagement, no whiteboard meeting.